Nominal Capacity
5kwh-60kwh
Specification
602*532*215mm
Production Cap.
500 Sets/Month
Battery Module Stacking Design
A smart Battery Management System (BMS) monitors the voltage, temperature, and current of the battery pack in real-time, ensuring safe and stable operation. Modular design allows users to flexibly adjust battery capacity based on energy needs.
All-in-One Design
Integration of the inverter, battery, and BMS improves space utilization and aesthetics. Efficient cooling solutions ensure stable operation under high loads. Streamlined exterior design hides wiring and matches various home styles.
Communication Interface
Utilizes CAN bus or RS485 for enhanced anti-interference capabilities. Supports multiple communication protocols and software upgrades to accommodate new standards.
| Battery Model |
Voltage |
Energy |
Capacity |
Size |
Current |
Material |
| DHDJ-5000*1 |
51.2V |
100Ah |
5.12kWh |
602*532*215mm |
100A |
LiFePO4 |
| DHDJ-5000*2 |
51.2V |
200Ah |
10.24kWh |
602*532*430mm |
100A |
LiFePO4 |
| DHDJ-5000*3 |
51.2V |
300Ah |
15.36kWh |
602*532*645mm |
100A |
LiFePO4 |
ISO 9001, CE, UN38.3, MSDS
Battery products are packaged using specialized, customs-approved hazardous packaging boxes ensuring compliance with international transportation standards. We hold safety certifications for land and sea transport, meeting UN 38.3 standards and maritime authority requirements.
⚙
Installation Instructions
1
Unboxing Preparation: Open the packaging and remove the battery units carefully.
2
Stacking Batteries: Follow the guidance to stack the battery units together. No special tools required.
3
Parallel Connection: Connect the battery units in parallel to ensure stable power output.
4
Communication Connection: Connect the communication cable to the battery management system.
5
Connecting to Power: Connect the pack to PV, mains electricity, and output power supply systems.
🏢
Professional BESS Provider
As a professional battery energy storage system (BESS) provider founded in 2017, we provide reliable energy storage solutions globally by integrating expertise in electrochemistry, power electronics, and system integration. With over 10,000 square meters of factory area, we are committed to sustainable green development and new energy solutions.
?
Frequently Asked Questions
Is there any electrical or mechanical adjustment required during the first startup?
It will be set at the factory; no adjustment is required as the system will automatically adapt.
What maintenance is required during operation?
Parameters are factory-set. No manual changes needed. You can monitor data via the LCD screen or a WIFI module with an APP.
How do I calculate the solar system needed for 4000 kWh annual consumption?
4000kWh/year ÷ 365 ≈ 10.9kWh/day. Configuration is determined based on daily consumption and solar availability.
What are your primary business components?
We focus on solar energy systems and components, specifically inverters and Lithium batteries.
What is the after-sales policy?
Within the shelf life, product defects are replaced free of charge. After shelf life, replacements are offered at a 20% discount.
How long is the price guarantee valid?
The price guarantee is typically valid for 15 days.